New acquisition: Building U27 – Area D4 Milanofiori 2000, Assago

Office Development

Architectural Design: Park Associati

Detail Design and Construction Management:  General Planning


Focchi technology:

Unitised façade consisting of  triple DGU and glass fins

Ground floor stick c.w. system

Terracotta louvres

New acquisition: Città Del Sole, Rome

Residential, office and retail development

Architect: Studio Labics


Focchi Technology:

Residential:

Thermal break windows – Aluminium louvers – Unitised façade with glazed brise soleil.

Office and retail:

Stick c.w. system with structural window – external double skin with vertical aluminium brise soleil

Europarco Tower

Tower façades installation completed, whilst the lower building is still under construction

Oxford Brookes University – installation phase

Project: Oxford Brookes University

Building destination: University Campus , classes, offices, auditorium, new library and teaching building

Architect: Design Engine Architects

Technology:

Fibre reinforced ventilated walls – SSG unitised system – grid and panel system – sunshading system consisting of featured toughened glass and vertical aluminium brise soleil – glazed roof


tags:

Croydon double skin façade installation

Project:  Council Office, Croydon UK
Design: EPR Architects

SSG Unitised climate wall double skin façade

Europarco Rome – Installation phases

Project: Torre EUROPARCO – Office Building , Rome
Architect: Studio Transit

Structural silicone unitised curtain walling – Aluminium rainscreen cladding – Vertical sun shading aluminium fins – Spandrel units with aluminium architectural features.

P7210820 P7210824 P7210827

DSCN0032 IMG-20111006-00003 IMG-20111006-00004

New acquisition: Libeskind residential lots – Citylife new development, Milan

Group of eight residential buildings of various heights from 4 to 13 floors

Focchi Technology:

Sliding doors
Single leaf windows with structural glazing
Double height curtain walling
Windows with integrated motorised blinds

9451 94626 9467_CL_Libeskind_Urbanfile_120109_e

Park House – Installation Phases

Project: PARK HOUSE Office and Residential Building, Oxford Street London
Architect: Robin Partington Architects

Unitised façades- Feature louvres and fins.

P6130012

P6280049-r

P6140005

P6140002

P6150010

New acquisitions: Croydon Council Office, University of Turin, Office Tower Europarco

counciloffice

Council Office, Croydon U.K

universita-torino

University of Turin – Deptartments of Jurisprudence and Political Science, Turin

europarco

Office Tower Europarco, Rome

European Aluminium in Renovation Award 2009

Winner European Aluminium in Renovation Award 2009

Project: Corriere della Sera, newspaper headquarter, Milan ITALY 

Category NON-RESIDENTIAL

European Aluminium Award 2009Report European Aluminium Award 2009

RCS Area Refurbishment, Buildings A2 and B5

Ristrutturazione area RCS - rendering

RCS Area Refurbishment – Buildings A2 and B5
Architects: Buildings A2: Studio Boeri – Buildings B5: Studio Barreca e La Varra
Client: Iniziativa Immobiliare 2 Spa
Contractor: Altair I.F.M.

Installation sequence

Regent’s Place – installation sequence

regents-place

Regent’s Place – London
Architect: Terry Farrell & Partners
Client: British Land Company plc
Contractor: Bovis Lend Lease Ltd.

Installation sequence

Snow Hill – installation sequence

Snow Hill vista facciata sud

Snow Hill Building 1 – Birmingham UK
Architect: Sidell Gibson Architects, London
Client: Ballymore Properties Ltd, London
Contractor: Kier Build Ltd, UK

Installation sequence

Polo di Eccellenza

Polo di Eccellenza

Polo di Eccellenza – Torre Lotto 26 – Desio (MI)
Architect: Progetto CMR Arch. Massimo Roj
Contractor: Addamiano Costruzioni Spa

Campari – installation sequence

Rendering Campari

Nuova Sede Direzionale del Gruppo Campari e Residenze
Architect: Arch. Mario Botta e Arch. Giancarlo Marzorati
Client: Gruppo Campari
Contactor: Moretti Contract Srl

Installation sequence